Benchmark builds Brock® grain bins with our own erection crews, the same crews that put up our steel buildings. One company plans the site, builds the bins and sets up the drying and handling to match.

How a bin project runs

  1. Plan the site: truck traffic, power, drainage and room to add bins later.
  2. Size the system: storage, drying capacity and handling speed. See sizing on-farm grain storage.
  3. Foundation: poured to the building’s engineered plans.
  4. Erection: our crew builds the bin, floor and aeration.
  5. Handling and drying: augers, unloading, dryer and aeration fans.
  6. Start-up: we walk you through running it.

Questions