The best building is the one sized for the equipment you’ll own in ten years, not the equipment you own today.

Size

  • Measure your widest and tallest machines folded for transport.
  • Add room to walk around each machine, and to open doors and cabs.
  • Plan for the next, bigger machine.

Doors and eaves

Door width and height set what fits. Eave height must clear the tallest machine and the door header.

Site

High ground with good drainage, room for trucks to turn, and a path for power and water.

Permits

Most counties require a permit and engineered drawings for a steel building.

Questions to ask a builder

  • Who handles design, permits and the foundation?
  • Are the crews yours or subcontracted? (Benchmark’s are our own.)
  • What’s the timeline, and what’s included?

See farm shops and equipment buildings and how a steel building project works.